General Building

Your Trusted Source

For Productive Construction Workforce

image for Singapore Changi Airport -Terminal 4

Singapore Changi Airport -Terminal 4

Delivered skilled labor to the production of precast components.

image for LTA – Havelock MRT Station

LTA – Havelock MRT Station

Supply labor for the production of precast segments, contributing to the construction and development of the station infrastructure.

image for HOYA at Tampines

HOYA at Tampines

Supply labor, materials, and partial machinery for the installation of precast components for 2 Storey Industrial Development, ensuring efficiency and quality in phase of construction.

image for HDB – Tengah Plantation Village

HDB – Tengah Plantation Village

The RC structural works have been successfully completed for two blocks of HDB housing, totaling 332 dwelling units (DU).

image for 3M Extension at Tuas

3M Extension at Tuas

Installation of precast components for 3-storey building with provide machinery to ensure a seamless and efficient installation process.

image for Bayshore MRT Station

Bayshore MRT Station

Supply and install precast walls and slabs, along with grouting the joints between precast components to ensure structural integrity and a seamless finish.

image for Mead Johnson Nutrition

Mead Johnson Nutrition

Supply skilled labor and high-quality materials to install precast components for Industrial Manufacturing Facility, to ensure a smooth and efficient installation process.

image for HDB – King George’s Heights

HDB – King George’s Heights

Involves reinforced concrete (RC) construction works along with the installation of precast components for a 33/37 storey high-rise building.